Tunneling/ Gallery construction

Building machinery and equipment for tunneling and gallery construction. An unbeatable offer.

Designation Description Parameters
    Weight (t) Drill arms Drilling range (m²)
Drill carriage Drill carriage, hydraulic with wheels 29,0 2 15 - 110
    Drawing height (m) Conveying capacitng (m³)  
Spray diffusers Spraying machine 11 40,00  
15 33,00  
    Platform height (m) Number of arms Load per Arm (kg)
Lifiting platforms   9,50 1 500,00
9,50 2 500,00
    Power rating (in kW) Hoe dipper capacity (m³) Weight (t)
Tunnel excavators Tunnel excavator with tracklaying truck 150 1,95 33,0
    Useful load (t) Empty weight (t) Power (kW)
Dumptrucks Dump truck with rigid frame 30,0 27,0 204

Work on the heading face using tunnel construction equipment from Streif Baulogistik
Spraying device from Streif Baulogistik used for the new Nuremberg-Ingolstadt ICE line project
Drill carriage used for tunnel construction work for the new Nuremberg-Ingolstadt ICE line
Streif Baulogistik provided a total of twelve drill carriages for tunnel construction for the new Nuremberg-Ingolstadt ICE line