Akropolis, Athens
|
|
Project period: 2007 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery of 2 revolving tower cranes:
- 1 Liebherr 280 EC H 12 Li, height of lift 31.90m, length of jib 70m
- Kran 2 Liebherr 180 EC H 10 Li, height of lift 32.10m, length of jib 50m
|
| Specifics: |
|
The two revolving tower cranes were used to transport over 300 ancient statues and sculptures as well as a further 4000 ancient finds from the world-renowned Akropolis rock to the new Museum of History in the valley. The exhibits were packaged in steel containers and passed on by cranes lined up at the hill.
|
|
top
|
| |
Glendoe Hydro Project, Scotland
|
|
Project period: 2006-2009 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of 150 accommodation containers as well as storage containers and workshops
- Supply of transformer stations and worksite switchgear
- Rental of various construction machinery (semitrailor tractors, telesstackers, Unimog with loading crane)
-
- Scaffolding and shuttering:
- Delivery of load towers, trestles and special shuttering
|
| Specifics: |
|
Due to the location on a slope and the local environmental restrictions, the whole container system was set up on wood piles
|
|
top
|
| |
Gotthard Base Tunnel, Switzerland
|
|
Project period: 2001-2011 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery of equipment and control systems for the curing carriage
- Electrical site equipment:
- 35 transformer stations as container or spherical transformer stations
- 3 output transformers 10 MVA
- approx. 460 pairs of medium high voltage line facilities
- Turboventilator
- Emergency container
|
| Specifics: |
- Transformer stations with automatic fire extinguishing system
- Supervision of construction site by local electrical engineers
|
|
top
|
| |
Hanover Airport tunnel construction
|
|
Project period: 2008-2009 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of two 63 K type cranes
- Scaffolding and shuttering:
- Shuttering material for construction of the floor and outer walls of the tunnel and for the entrance and exit ramp
- Delivery of approx. 200sqm of standard frame shuttering
- Delivery of 350sqm of StreifTelos telescopic wall shuttering
|
| Specifics: |
- The road tunnel to the terminal is constructed in an open excavation. Each roughly 10m long, the individual tunnel elements are split into floor panel, walls and ceiling for construction, and the components cemented separately. The appropriate shutterings are designed in a way that each section of the construction can be produced at equal pace. The shuttering elements were delivered to the site as ready assembled units.
|
|
top
|
| |
Highway North and Northeast Beltway, Vienna
|
|
Project period: 2007-2010 |
| Contract work: |
|
- Building machinery and equipment:
- Financing and provision of earth-moving and road construction machinery, including crawler trucks, rollers, mobile diggers, dump trucks, crawler excavators, telescopic stackers
- Electrical site equipment
- Small equipment
- Revolving tower cranes
- Container supply
- Formwork supply
|
|
|
|
|
|
top
|
| |
Kaiser lock JV, Bremerhaven
|
|
Project period: 2007-2010 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of containers
- Civil engineering equipment: vibrator, lead, cable dredger, crawler crane, hammer
- Electrical site equipment
|
| Specifics: |
- Building conversion including heavy piling during ongoing lock and quay operation
- Technical superiority due to variety of support sections
|
|
top
|
| |
Airrail Center, Frankfurt
|
|
Project period: 2007-2010 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of 7 revolving tower cranes: three 280 EC-H, two MDT 222, one MDT 218 and one MDT 302
- Maintenance and repair of all 17 RTCs used on the site
- Provision of four transport elevators MX 2024
- Delivery and assembly of 130 containers (site restroom facility, office and first aid containers)
- Winter heating: delivery and installation of a heating system consisting of 81 devices with a heat output of 11,800KW incl. the required site power supply
|
| Specifics: |
- Site located right next to Frankfurt Airport, above the long-distance railway station and between the heavily frequented highway A3 and freeway B43
- All cranes were provided with obstruction lights due to their vicinity to Frankfurt Airport, and with work area boundaries due to their closeness to the highways.
|
|
top
|
| |
Elbphilharmonie (philharmonic hall), Hamburg
|
|
Project period: 2007-2010 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of 5 revolving tower cranes (HH up to 120m) incl. crane concept
- Delivery and assembly of 136 containers (office, crew accommodation)
-
Scaffolding and shuttering:
- Large delivery of different shuttering systems for foundation and bare brick work:
- Framax and Streif Light formwork, climbing formwork, Flexdeck and Skydeck floor formwork, round steel columns, column formwork, heavy-duty props, Layher stacking tower, sinking platforms, folding platforms, transfer platform
- Special shuttering
- Work and weather protection enclosure
Services:
|
| Specifics: |
- Confined site in Hamburg's harbor/warehouse district, little storage and delivery space
- Containers were integrated directly into the steel scaffolding supporting the facade of the hollowed warehouse, at seven and a half meters above the water for flood protection
- Supply of crane parts on pontoons along the river Elbe
|
|
top
|
| |
Kreuzbauten, Federal Ministry of Education and Research, Bonn
|
|
Project period:
2005-2009
|
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of site restroom facility and office containers
- Scaffolding and shuttering:
- Services:
- Supply logistics/waste management
- Instruction of parties involved in the construction process
- Transportation logistics (delivery, unloading, use of building elevator)
- Video surveillance
- Security service and key management
- Space management / cleaning and tidying
- Daily meetings
|
| Specifics: |
- Construction during ongoing ministry activities
- High security requirements
- Multiple changes to the whole site equipment area
- Separation of site and ministry traffic
- Only possible site road is the underground garage roof with a max. load of 16t
|
|
top
|
| |
Pier A-PLUS, Frankfurt Airport
|
|
Project period: 2008-2012 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery, assembly and catering service for several container systems (approx. 400) for parties involved in the construction
- Electrical site equipment (approx. 12km of cable; 200 connection boxes/switchgear)
- Supply of scaffolding, site elevators and hoisting devices
- Services:
- General site equipment and logistics
- Preparation of the site infrastructure (site roads, site water, telecommunications, crossings, technical infrastructure)
- Logistics coordination and management (space management)
- Site protection and site access control
- Site cleaning and waste management
|
| Specifics: |
- Stringent security requirements at the airport
- Consideration of air traffic
- Other building projects in the immediate vicinity requiring synchronization of transportation
- Crew traffic on the site
|
|
top
|
| |
BMW factory, Leipzig
|
|
Project period: 2001-2005 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of container systems
- Services:
- Supply logistics
- Access control
- Transportation scheduling
- Basic infrastructure (site roads, storage and parking spaces, fire brigade, site radio system, signage, winter service)
- Storage space management (planning of SE space requirement, contracting and maintenance of waste management)
- Earth mass logistics
- Coordination with site fire brigade and site security service
|
| Specifics: |
- Delivery of ready-to-use container system used primarily as info center and catering facility
- Nine building projects on a 514-acre lot
- On average, up to 450 trucks per day
- Close cooperation with the site security service
|
|
top
|
| |
Emporio, Hamburg
|
|
Project period: 2009-2011 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of 30 x 10m and 50 x 6m containers incl. media connections
- Electrical construction site equipment with transformer stations
- Delivery and assembly of a 280 EC-H 12 Litronic, stand-alone
- Delivery and assembly of a MDT 222 and two MDT 162
- Services:
- Site logistics coordination
- Site traffic management
- Storage facility management
- Access control
- Surveillance
- Provision of elevator operators
- Supply and waste management
- Winter service
- Energy supply
|
| Specifics: |
- The new building is erected right next to the listed Unilever high-rise
- To ensure stability of the free-standing crane without the usual connection to a building, tower elements of different strength were combined to taper up
- Restricted site due to city center location
|
|
top
|
| |
Galeria Malta shopping and leisure center, Posen
|
|
Project period: 2007-2008 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery, assembly and maintenance of 8 revolving tower cranes
|
|
|
|
|
|
top
|
| |
Grand Mall, Varna
|
|
Project period: 2009-2010 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of 7 revolving tower cranes:
- 1 71 EC,
- 2 71 EC-B5
- 4 180 EC-H
- Two 120m elevators
|
|
|
|
|
|
top
|
| |
New Nuremberg-Ingolstadt ICE line
|
|
Project period: 1998-2006 |
| Contract work: |
|
- Building machinery and equipment:
- Various tunnelling equipment:
- 12 drill carriages
- 12 mobile concrete spraying devices
- 16 tunnel wheel loaders
- 41 dump trucks
- 6 lifting platforms
- 10 tunnel diggers
- 1 electric crawler drill carriages
- 1 tunnel-driving machine ITC 112
- 3 concrete curing carriage
- 4 reinforcement carriages
- 6 safety containers
- 12 angle dozers
- 5 mobile diggers
- 5 revolving tower cranes
- 4 electric compressors
- 4 wheel loaders
- 3 water pressure booster systems
-
Various small equipment
- Electrical site equipment:
- 9 interconnecting transformer stations 20 KV
- 12 tunnel transformer stations 10 KV
- 300 site switchgear
- Delivery of various container modules (office, site restroom facility, storage, workshop, sanitary)
-
Scaffolding and shuttering:
- Special shuttering: shaft formwork, floor and vault formwork carriage
|
|
|
|
|
|
top
|
| |
Predöhl quay JV, Hamburg
|
|
Project period: 2008-2009 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of containers
- Civil engineering equipment: pontoon, work boat, crawler crane, vibrator
|
| Specifics: |
- Work during ongoing (container) handling
- Preceding soil replacement for pile driving track
|
|
top
|
| |
koelnmesse, north exhibition hall construction, Cologne
|
|
Project period: 2004-2005 |
| Contract work: |
|
-
Building machinery and equipment:
- Delivery and assembly of 5 revolving tower cranes:
- 180 EC-H
- 180 EC-H Litronic
- 280 EC-H 12 Litronic
- 280 EC-H
- Provision of 2 mobile cranes (Fuchs 118m)
- Provision of 2 crawler cranes (HITACHI KH 125)
- Provision of 4 telescopic stackers (AVT 1330 SLT)
- Delivery and assembly of 260 containers
- Electrical site equipment
|
|
|
|
|
|
top
|
| |
MaxCologne, Cologne
|
|
Project period: 2010-2012 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of 3 revolving tower cranes: two LH 180 EC-H10li and one LH 280 EC-H12li
- Provision of containers (site restroom facility, storeroom and access containers)
- Electrical site equipment
- Scaffolding and shuttering:
- 200 square meters of StreifLight frame formwork
- Services:
- Security and health and safety coordination
- Site power
|
| Specifics: |
- For space reasons, LH 280 EC-H12li will be set up on the existing high-rise. Due to the proximity to Cologne-Bonn airport and a helicopter landing space at the exhibition center in Deutz, the crane site required approval under air traffic laws.
|
|
top
|
| |
Office and administration building of GNS, Essen
|
|
Project period: 2009-2011 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of three revolving tower cranes: two MDT 178 and one LH 140 EC-H li
- Delivery and assembly of a container system made up of around 20 modules
- Electrical site equipment
- Scaffolding and shuttering:
- 450 square meters of StreifLight frame formwork for the foundations
- 800 square meters of support shuttering and 1,080 square meters of steel formwork for the walls
- 4,000 square meters of quick ceiling formwork and 1,500 square meters of panel floor formwork
- Services:
- Security and health and safety coordination
- Access control
|
|
|
|
|
|
top
|
| |
Publishing house Süddeutscher Verlag, Munich
|
|
Project period: 2006-2008 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of 5 revolving tower cranes (HH 131.6m and 120.3m with building bracing)
- Delivery and assembly of 64 office containers
- 1 access container with barrier
- Electrical site equipment incl. container supply connections, lighting
- Scaffolding and shuttering:
- Delivery of formwork for approx. 125,000sqm of area to be lined
- Some 150 running meter of fall and weather protection elements for the high-rise
- Services:
- Access control
- Setup of a central control station
- Access management with scheduled deliveries and collections
- Building floor management
- Site supervision
- Health and safety
- Supply and waste management logistics
- Daily waste disposal and primary site cleaning
- Coordination of site elevator times and cranes
|
| Specifics: |
- Inner city site
- Up to 100 subcontractors on site at a time
- Two site access poin
- Highly confined site
|
|
top
|
| |
Residential building, Moscow
|
|
Project period: 2010-2011 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of a revolving tower crane Liebherr 550 EC-H 40, set up as free-standing unit, with a hook clearance of 84m
|
| Specifics: |
- The LH 550 EC-H 40 was one of the first Liebherr cranes of this type to be set up in Russia.
|
|
top
|
| |
PPP schools, Cologne
|
|
Project period: 2005-2007 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery, assembly and equipment of containers as temporary facilities for seven schools at five locations in Cologne (total of approx. 300 modules)
- Preparation of foundations including static calculations
- Foundation lining
- Connection to supply lines incl. water, waste water and power
- Line sheathing
|
| Specifics: |
- Tight schedule
- At times, specific hourly scheduling of assembly and equipment work
|
|
top
|
| |
PPP schools, Frankfurt am Main
|
|
Project period: 2007-2009 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery, assembly and equipment of 810 containers as temporary facilities for four Frankfurt schools
|
| Specifics: |
|
Tight schedule: majority of assemblies of the partly 3-story facilities needed to be completed within the 6-week summer vacation to ensure as little interruption of school activities as possible.
|
|
top
|
| |
PPP schools, Leverkusen
|
|
Project period: 2005-2008 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery, assembly and equipment of two containers as temporary facilities for two schools (total of approx. 140 modules)
- Preparation of foundation
- Water supply and waste water disposal incl. necessary shafts
- Rainwater discharge for both facilities
- Creation of parking spaces for teaching staff
|
| Specifics: |
- Setup of two separate EDP networks and three server cabinets
- Provision of EDP rooms with matting for conductibility
|
|
top
|
| |
Ricarda Huch high school, Gelsenkirchen
|
|
Project period: 2009-2010 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and setup of a container system comprising 84 modules used as temporary classrooms
- Equipment: Chalkboards, lightning protection, extensive fire alarm system, fire extinguishers, emergency exit lighting, electricity supply, creep zone protection
- Theft and vandalism insurance
|
| Specifics: |
- The heating in the containers is controlled via a central engineering room, from where two thirds of the entire heat output can be switched on and off in two stages
|
|
top
|
| |
Riedberg high school, Frankfurt
|
|
Project period: 2009-2012 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of 184 containers as temporary classrooms
- Preparation of foundations
- Connection to supply lines including water, sewage and power (via substation)
- Equipment: Lightning protection, building alarm, outdoor lighting, recess signal, dry lining, smoke control doors, sewage drain through container floor
|
|
|
|
|
|
top
|
| |
Stadiums for the 2012 European Football Championship, Poland
|
|
Project period: 2009-2010 |
| Contract work: |
|
- Building machinery and equipment:
- Warsaw stadium: Delivery and assembly of twelve LH180 EC-H, 256 HC, 280 EC-H and 250 EC-B type revolving tower cranes
- Posen: Delivery and assembly of four Liebherr 550 EC-H and one Potain MDT 222
- Technical consulting
|
| Specifics: |
- Posen: To create space for stadium roof assembly, four 550 EC-H were dismantled down to the foundations within a fortnight and then re-assembled to their previous height of approx. 70m
|
|
top
|
| |
United Nations Campus (UNC), Bonn
|
|
Project period: 2009-2011 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery of site power, lighting and water
- Delivery and assembly of 21 daytime accommodation and four sanitary containers
- Delivery and assembly of escape staircases and escape bridges
- Flood protection for the building right next to the Rhine
- Equipment of a first-aid facility
- Provision of chemical toilets
- Services:
- Traffic safety
- Management and control of staff and vehicle movements
- Access control and surveillance
- Transportation logistics and waste disposal management
- Demolition and dismantling for site clearance
- Delivery and setup of hoardings and gate systems
- Delivery and setup of a tire cleaning facility
- Commissioning of an existing elevator, and delivery and installation of a building elevator
- Dismantling and landscaping, setup of the site facility areas and site roads
- Cleaning services (outside, site management container and accommodations)
|
|
|
|
|
|
top
|
| |
University Hospital, 2nd construction phase, Giessen
|
|
Project period: 2009-2010 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and setup of 100 office and day accommodation containers
- Services:
- Transportation logistics
- Storage space management
- Traffic area management
- Subcontractor logistics coordination
- Site protection and surveillance incl. identification system
- Implementation of the fire protection concept
- Provision of elevator operators
- Supply and waste management logistics
- Provision of Dixi toilets
|
| Specifics: |
- At peak times, there are up to 500 people working on the site
- Coordination of an average 50 transportations/day
|
|
top
|
| |
Rheinau harbor, Cologne
|
|
Project period: 2001-2009 |
| Contract work: |
|
- Building machinery and equipment:
- Provision of cranes, electrical SE, containers for the individual projects
- Services:
- Logistics control / management of storages space
- Access control
- Coordination with all involved re. access, loading/unloading, storage space, etc.
- Instruction of parties involved in construction
- Security coordination
- Coordination of flood protection
- Power supply
|
| Specifics: |
- Total area covers a length of approx. 2km, some 30 building projects in the area, 3 entrances max.
- Compliance with preservation order
- Parallel events (sports, chocolate museum)
- Some site parts already occupied by users/lessees during construction
|
|
top
|
| |
Rondo 1 office building, Warsaw
|
|
Project period: 2003-2005 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery, assembly and maintenance of 2 revolving tower cranes
|
| Specifics: |
- The tallest crane climbed to over 200m
|
|
top
|
| |
Schorsa residential complex, Kiev
|
|
Project period: 2007 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of 3 revolving tower cranes
|
|
|
|
|
|
top
|
| |
SkyTower multifunctional complex, Breslau
|
|
Project period: 2008-2012 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery, assembly and maintenance of 5 revolving tower cranes
|
| Specifics: |
|
The tallest crane climbed to 260m
|
|
top
|
| |
ThyssenKrupp quarters, Essen
|
|
Project period: 2007-2010 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of containers for various parties involved in the construction
- Electrical site equipment
- Scaffolding and shuttering:
- 3,000sqm of frame shuttering
- 3,950sqm of panel floor formwork
- Services:
- Construction logistics master plan
- Access control
- Setup of a central logistics control station
- Safety and health protection coordination
- Coordination of construction logistics for interior works
- Planning and coordination of furniture logistics and moving logistics
- Traffic control to and on site
- Cleaning during occupation of the premises
- Power supply
|
| Specifics: |
- 568 acres of inner city site
- Invovelment of around twelve general contractors
- At times up to 100 companies working on site
- One site access point
|
|
top
|
| |
Tower 185, Frankfurt
|
|
Project period: 2009-2011 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of seven luffing jibs: three Wolffkran 355 B, three Wolffkran 180 B, one 160 HC-L
- Delivery and assembly of 70 office and daytime accommodation containers
- Supply, maintenance and servicing of all electrical site equipment
- Provision of site utilities
- Scaffolding and shuttering:
- System shuttering for straight walls and cores
- Flex ceiling shuttering
- Flexible circular shuttering elements for curved walls
- Bearer beams and shaft platforms
- Various support shutterings and door system recesses
- Proprietary StreifLight for parapets and walls to be erected later
- Use of hydraulic self-climbing formwork for core outer walls and perforated facade
- Services:
|
| Specifics: |
- Two Wolffkran 355 B will climb to a final height of 190m and will be anchored to the building using seven bracings
|
|
top
|
| |
Vienna Skylink, Vienna
|
|
Project period: 2005-2009 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery, assembly and management of three container villages (office, crew, sanitary containers):
- 111 containers, 3-story
- 90 containers, 3-story
- 66 containers, 3-story
- incl. all sideline work such as foundation work, water and waste water connection, disposal and separation of waste material, management of quarters, monitoring of house rules and daily cleaning
- 20 storage containers
- Delivery of 2 revolving tower cranes 180 EC-H
- Electrical site equipment:
- four transformer stations 1000V
- almost 9km of cabling
- over 100 switch cabinets
- Telescopic stacker
|
| Specifics: |
- Stringent security requirements at the airport
- Relocation of the container villages during ongoing operations due to construction progress
- Several modifications of electrical installations due to construction progress
|
|
top
|
| |
Weser Tower, Bremen
|
|
Project period: 2008-2009 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of a Liebherr EC-H Litronic
- Scaffolding and shuttering:
- Delivery of shuttering for reinforced concrete works and formwork systems:
- 350sqm of steel formwork
- 500sqm of special shuttering for exposed concrete SB3
- 1,500sqm of panel floor formwork
- Square column formwork, round steel column systems, two crane displaceable climbing frame units with pertinent finishing platform
- 110 running meters of work and weather protection enclosure
|
| Specifics: |
- Crane of 98 meters was set up as free-standing unit
|
|
top
|
| |
IAAF World Championships in Athletics, Berlin 2009
|
|
Project period: 2009 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and setup of over 360 containers for the temporary international media center
- Containers were used by the TV stations as broadcasting and technology facilities and as office and meeting rooms
- Setup of two-story systems within four weeks including air conditioning and handover
- Dismantling within a fortnight
- Equipment of the facilities in accordance with a room specifications previously defined by the organizer
|
| Specifics: |
- Air conditioning of the rooms, with some areas required cooling of up to 20 kilowatts
- Static calculations of the forces acting at each corner point of the cranes and lifting gear used, as the ground was not capable in places of carrying heavy loads
|
|
top
|
| |
Zlote Tarasy multifunctional complex, Warsaw
|
|
Project period: 2003-2005 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery, assembly and maintenance of 10 revolving tower cranes with different configurations
|
| Specifics: |
|
Back then, the site of the building complex was one of the biggest in Europe; to avoid a collision of cranes, all top slewing cranes were provided with a 'top tracing' system
|
|
top
|
| |
|
|
| References - Building machinery |
|
Airrail Center, Frankfurt
|
|
Akropolis, Athens
|
|
BMW factory, Leipzig
|
|
Elbphilharmonie (philharmonic hall), Hamburg
|
|
Emporio, Hamburg
|
|
Galeria Malta shopping and leisure center, Posen
|
|
Glendoe Hydro Project, Scotland
|
|
Gotthard Base Tunnel, Switzerland
|
|
Grand Mall, Varna
|
|
Hanover Airport tunnel construction
|
|
Highway North and Northeast Beltway, Vienna
|
|
IAAF World Championships in Athletics, Berlin 2009
|
|
Kaiser lock JV, Bremerhaven
|
|
koelnmesse, north exhibition hall construction, Cologne
|
|
Kreuzbauten, Federal Ministry of Education and Research, Bonn
|
|
MaxCologne, Cologne
|
|
New Nuremberg-Ingolstadt ICE line
|
|
Office and administration building of GNS, Essen
|
|
Pier A-PLUS, Frankfurt Airport
|
|
PPP schools, Cologne
|
|
PPP schools, Frankfurt am Main
|
|
PPP schools, Leverkusen
|
|
Predöhl quay JV, Hamburg
|
|
Publishing house Süddeutscher Verlag, Munich
|
|
Residential building, Moscow
|
|
Rheinau harbor, Cologne
|
|
Ricarda Huch high school, Gelsenkirchen
|
|
Riedberg high school, Frankfurt
|
|
Rondo 1 office building, Warsaw
|
|
Schorsa residential complex, Kiev
|
|
SkyTower multifunctional complex, Breslau
|
|
Stadiums for the 2012 European Football Championship, Poland
|
|
ThyssenKrupp quarters, Essen
|
|
Tower 185, Frankfurt
|
|
United Nations Campus (UNC), Bonn
|
|
University Hospital, 2nd construction phase, Giessen
|
|
Vienna Skylink, Vienna
|
|
Weser Tower, Bremen
|
|
Zlote Tarasy multifunctional complex, Warsaw
|
|