Beltway and Vejle bridge, Denmark

Project period: 2005-2007
Contract work:
  • Scaffolding and shuttering:
    • Delivery of special shuttering for tunnel, bridge and troughs
  • Building machinery and equipment:
    • provision of a revolving tower crane
Specifics:
  • Individual components in exposed concrete quality
top
 

Glendoe Hydro Project, Scotland

Project period: 2006-2009
Contract work:
  • Building machinery and equipment:
    • Delivery and assembly of 150 accommodation containers as well as storage containers and workshops
    • Supply of transformer stations and worksite switchgear
    • Rental of various construction machinery (semitrailor tractors, telesstackers, Unimog with loading crane)
  • Scaffolding and shuttering:
    • Delivery of load towers, trestles and special shuttering
Specifics:
Due to the location on a slope and the local environmental restrictions, the whole container system was set up on wood piles
top
 

Hanover Airport tunnel construction

Project period: 2008-2009
Contract work:
  • Building machinery and equipment:
    • Delivery and assembly of two 63 K type cranes
  • Scaffolding and shuttering:
    • Shuttering material for construction of the floor and outer walls of the tunnel and for the entrance and exit ramp
    • Delivery of approx. 200sqm of standard frame shuttering
    • Delivery of 350sqm of StreifTelos telescopic wall shuttering
Specifics:
  • The road tunnel to the terminal is constructed in an open excavation. Each roughly 10m long, the individual tunnel elements are split into floor panel, walls and ceiling for construction, and the components cemented separately. The appropriate shutterings are designed in a way that each section of the construction can be produced at equal pace. The shuttering elements were delivered to the site as ready assembled units.
top
 

Barwa Commercial Avenue, Qatar

Project period: 2008-2009
Contract work:
  • Scaffolding and shuttering:
    • Sale of a total approx. 5,000sqm of StreifLight (steel) and StreifTelos wall and pillar shuttering
    • 20,000sqm of beam and ceiling shuttering from our partner companies Faresin and Pafili
    • On-site services:
      • provision of topping-out foremen, coordination and supervision of initial assembly of the shuttering, staff training in formwork handling
Specifics:
  • Development of a shuttle carriage for propping platforms which allows whole components to be shifted
  • Development of a pre-assembled stair formwork system which allows stairs and landings to be pre-assembled in one piece on site
  • Transportation of approx. 2,000t of material in 100 maritime containers to Doha
top
 

Elbphilharmonie (philharmonic hall), Hamburg

Project period: 2007-2010
Contract work:
  • Building machinery and equipment:
    • Delivery and assembly of 5 revolving tower cranes (HH up to 120m) incl. crane concept
    • Delivery and assembly of 136 containers (office, crew accommodation)
  • Scaffolding and shuttering:
    • Large delivery of different shuttering systems for foundation and bare brick work:
      • Framax and Streif Light formwork, climbing formwork, Flexdeck and Skydeck floor formwork, round steel columns, column formwork, heavy-duty props, Layher stacking tower, sinking platforms, folding platforms, transfer platform
      • Special shuttering
    • Work and weather protection enclosure
  • Services:
    • Site power supply
Specifics:
  • Confined site in Hamburg's harbor/warehouse district, little storage and delivery space
  • Containers were integrated directly into the steel scaffolding supporting the facade of the hollowed warehouse, at seven and a half meters above the water for flood protection
  • Supply of crane parts on pontoons along the river Elbe
top
 

Kreuzbauten, Federal Ministry of Education and Research, Bonn

Project period: 2005-2009
Contract work:
  • Building machinery and equipment:
    • Delivery and assembly of site restroom facility and office containers
  • Scaffolding and shuttering:
    • Enclosure
  • Services:
    • Supply logistics/waste management
    • Instruction of parties involved in the construction process
    • Transportation logistics (delivery, unloading, use of building elevator)
    • Video surveillance
    • Security service and key management
    • Space management / cleaning and tidying
    • Daily meetings
Specifics:
  • Construction during ongoing ministry activities
  • High security requirements
  • Multiple changes to the whole site equipment area
  • Separation of site and ministry traffic
  • Only possible site road is the underground garage roof with a max. load of 16t
top
 

New Nuremberg-Ingolstadt ICE line

Project period: 1998-2006
Contract work:
  • Building machinery and equipment:
    • Various tunnelling equipment:
      • 12 drill carriages
      • 12 mobile concrete spraying devices
      • 16 tunnel wheel loaders
      • 41 dump trucks
      • 6 lifting platforms
      • 10 tunnel diggers
      • 1 electric crawler drill carriages
      • 1 tunnel-driving machine ITC 112
      • 3 concrete curing carriage
      • 4 reinforcement carriages
      • 6 safety containers
      • 12 angle dozers
      • 5 mobile diggers
      • 5 revolving tower cranes
      • 4 electric compressors
      • 4 wheel loaders
      • 3 water pressure booster systems
    • Various small equipment
    • Electrical site equipment:
      • 9 interconnecting transformer stations 20 KV
      • 12 tunnel transformer stations 10 KV
      • 300 site switchgear
    • Delivery of various container modules (office, site restroom facility, storage, workshop, sanitary)
  • Scaffolding and shuttering:
    • Special shuttering: shaft formwork, floor and vault formwork carriage
 
 
top
 

Södertälje Bridge, Sweden

Project period: 2008-2009
Contract work:
  • Scaffolding and shuttering:
    • Delivery of abutment shuttering: 1,000sqm of special shuttering
    • Delivery of central pillar shuttering: 105sqm of special shuttering
    • Delivery of 250sqm of rope guided climbing framework incl. pertinent platforms
    • 400cu m of supporting structure
Specifics:
  • When producing the special shuttering for the abutment and the central pillars, particular attention was paid to ensuring reusability of the elements produced for other structural members.
top
 

Landmark tower and base building, Bremen

Project period: 2009-2010
Contract work:
  • Scaffolding and shuttering:
    • Delivery of shuttering for walls, ceilings, columns and project-related climbing formwork for the elevator walls:
      • Framax frame shuttering
      • Streif round steel shuttering (support columns)
      • Streif-KS column formwork (for square columns)
      • Streif quick ceiling support formwork in connection with filigree support
      • ID15 heavy-duty tower for the foyer in connection with a quick ceiling support system
      • Skydeck with drophead system for the floor formwork
      • KG240 for the elevator walls on the outside of the tower (in combination with WWP)
    • 82 running meters of work and weather protection enclosure (WWP)
Specifics:
  • Due to highly acute-angled corners, special parts were added to the work and weather protection elements.
  • Client used the WWP for large-space advertising.
top
 

MaxCologne, Cologne

Project period: 2010-2012
Contract work:
  • Building machinery and equipment:
    • Delivery and assembly of 3 revolving tower cranes: two LH 180 EC-H10li and one LH 280 EC-H12li
    • Provision of containers (site restroom facility, storeroom and access containers)
    • Electrical site equipment
  • Scaffolding and shuttering:
    • 200 square meters of StreifLight frame formwork
  • Services:
    • Security and health and safety coordination
    • Site power
Specifics:
  • For space reasons, LH 280 EC-H12li will be set up on the existing high-rise. Due to the proximity to Cologne-Bonn airport and a helicopter landing space at the exhibition center in Deutz, the crane site required approval under air traffic laws.
top
 

Office and administration building of GNS, Essen

Project period: 2009-2011
Contract work:
  • Building machinery and equipment:
    • Delivery and assembly of three revolving tower cranes: two MDT 178 and one LH 140 EC-H li
    • Delivery and assembly of a container system made up of around 20 modules
    • Electrical site equipment
  • Scaffolding and shuttering:
    • 450 square meters of StreifLight frame formwork for the foundations
    • 800 square meters of support shuttering and 1,080 square meters of steel formwork for the walls
    • 4,000 square meters of quick ceiling formwork and 1,500 square meters of panel floor formwork
  • Services:
    • Security and health and safety coordination
    • Access control
 
 
top
 

Publishing house Süddeutscher Verlag, Munich

Project period: 2006-2008
Contract work:
  • Building machinery and equipment:
    • Delivery and assembly of 5 revolving tower cranes (HH 131.6m and 120.3m with building bracing)
    • Delivery and assembly of 64 office containers
    • 1 access container with barrier
    • Electrical site equipment incl. container supply connections, lighting
  • Scaffolding and shuttering:
    • Delivery of formwork for approx. 125,000sqm of area to be lined
    • Some 150 running meter of fall and weather protection elements for the high-rise
  • Services:
    • Access control
    • Setup of a central control station
    • Access management with scheduled deliveries and collections
    • Building floor management
    • Site supervision
    • Health and safety
    • Supply and waste management logistics
    • Daily waste disposal and primary site cleaning
    • Coordination of site elevator times and cranes
Specifics:
  • Inner city site
  • Up to 100 subcontractors on site at a time
  • Two site access poin
  • Highly confined site
top
 

Terminal 2 construction, Munich Airport

Project period: 2000-2001
Contract work:
  • Scaffolding and shuttering:
    • Delivery of formwork for carcass work (560,000sqm of area to be lined)
    • Technical job processing and preparation of timing and process plans
    • Share in joint supplies: 60%
    • Local formwork coordinators
 
 
top
 

Tower 185, Frankfurt

Project period: 2009-2011
Contract work:
  • Building machinery and equipment:
    • Delivery and assembly of seven luffing jibs: three Wolffkran 355 B, three Wolffkran 180 B, one 160 HC-L
    • Delivery and assembly of 70 office and daytime accommodation containers
    • Supply, maintenance and servicing of all electrical site equipment
    • Provision of site utilities
  • Scaffolding and shuttering:
    • System shuttering for straight walls and cores
    • Flex ceiling shuttering
    • Flexible circular shuttering elements for curved walls
    • Bearer beams and shaft platforms
    • Various support shutterings and door system recesses
    • Proprietary StreifLight for parapets and walls to be erected later
    • Use of hydraulic self-climbing formwork for core outer walls and perforated facade
  • Services:
    • Energy supply
Specifics:
  • Two Wolffkran 355 B will climb to a final height of 190m and will be anchored to the building using seven bracings
top
 

Weser Tower, Bremen

Project period: 2008-2009
Contract work:
  • Building machinery and equipment:
    • Delivery and assembly of a Liebherr EC-H Litronic
  • Scaffolding and shuttering:
    • Delivery of shuttering for reinforced concrete works and formwork systems:
      • 350sqm of steel formwork
      • 500sqm of special shuttering for exposed concrete SB3
      • 1,500sqm of panel floor formwork
      • Square column formwork, round steel column systems, two crane displaceable climbing frame units with pertinent finishing platform
    • 110 running meters of work and weather protection enclosure
Specifics:
  • Crane of 98 meters was set up as free-standing unit
top
 
References - Shuttering
Barwa Commercial Avenue, Qatar
Beltway and Vejle bridge, Denmark
Elbphilharmonie (philharmonic hall), Hamburg
Glendoe Hydro Project, Scotland
Hanover Airport tunnel construction
Kreuzbauten, Federal Ministry of Education and Research, Bonn
Landmark tower and base building, Bremen
MaxCologne, Cologne
New Nuremberg-Ingolstadt ICE line
Office and administration building of GNS, Essen
Publishing house Süddeutscher Verlag, Munich
Södertälje Bridge, Sweden
Terminal 2 construction, Munich Airport
Tower 185, Frankfurt
Weser Tower, Bremen