Beltway and Vejle bridge, Denmark
|
| Project period: 2005-2007 |
| Contract work: |
|
- Scaffolding and shuttering:
- Delivery of special shuttering for tunnel, bridge and troughs
- Building machinery and equipment:
- provision of a revolving tower crane
|
| Specifics: |
- Individual components in exposed concrete quality
|
| top |
| |
Glendoe Hydro Project, Scotland
|
| Project period: 2006-2009 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of 150 accommodation containers as well as storage containers and workshops
- Supply of transformer stations and worksite switchgear
- Rental of various construction machinery (semitrailor tractors, telesstackers, Unimog with loading crane)
-
- Scaffolding and shuttering:
- Delivery of load towers, trestles and special shuttering
|
| Specifics: |
|
Due to the location on a slope and the local environmental restrictions, the whole container system was set up on wood piles
|
| top |
| |
Hanover Airport tunnel construction
|
| Project period: 2008-2009 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of two 63 K type cranes
- Scaffolding and shuttering:
- Shuttering material for construction of the floor and outer walls of the tunnel and for the entrance and exit ramp
- Delivery of approx. 200sqm of standard frame shuttering
- Delivery of 350sqm of StreifTelos telescopic wall shuttering
|
| Specifics: |
- The road tunnel to the terminal is constructed in an open excavation. Each roughly 10m long, the individual tunnel elements are split into floor panel, walls and ceiling for construction, and the components cemented separately. The appropriate shutterings are designed in a way that each section of the construction can be produced at equal pace. The shuttering elements were delivered to the site as ready assembled units.
|
| top |
| |
Barwa Commercial Avenue, Qatar
|
| Project period: 2008-2009 |
| Contract work: |
|
- Scaffolding and shuttering:
- Sale of a total approx. 5,000sqm of StreifLight (steel) and StreifTelos wall and pillar shuttering
- 20,000sqm of beam and ceiling shuttering from our partner companies Faresin and Pafili
- On-site services:
- provision of topping-out foremen, coordination and supervision of initial assembly of the shuttering, staff training in formwork handling
|
| Specifics: |
- Development of a shuttle carriage for propping platforms which allows whole components to be shifted
- Development of a pre-assembled stair formwork system which allows stairs and landings to be pre-assembled in one piece on site
- Transportation of approx. 2,000t of material in 100 maritime containers to Doha
|
| top |
| |
Elbphilharmonie (philharmonic hall), Hamburg
|
| Project period: 2007-2010 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of 5 revolving tower cranes (HH up to 120m) incl. crane concept
- Delivery and assembly of 136 containers (office, crew accommodation)
-
Scaffolding and shuttering:
- Large delivery of different shuttering systems for foundation and bare brick work:
- Framax and Streif Light formwork, climbing formwork, Flexdeck and Skydeck floor formwork, round steel columns, column formwork, heavy-duty props, Layher stacking tower, sinking platforms, folding platforms, transfer platform
- Special shuttering
- Work and weather protection enclosure
Services:
|
| Specifics: |
- Confined site in Hamburg's harbor/warehouse district, little storage and delivery space
- Containers were integrated directly into the steel scaffolding supporting the facade of the hollowed warehouse, at seven and a half meters above the water for flood protection
- Supply of crane parts on pontoons along the river Elbe
|
| top |
| |
Kreuzbauten, Federal Ministry of Education and Research, Bonn
|
| Project period:
2005-2009
|
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of site restroom facility and office containers
- Scaffolding and shuttering:
- Services:
- Supply logistics/waste management
- Instruction of parties involved in the construction process
- Transportation logistics (delivery, unloading, use of building elevator)
- Video surveillance
- Security service and key management
- Space management / cleaning and tidying
- Daily meetings
|
| Specifics: |
- Construction during ongoing ministry activities
- High security requirements
- Multiple changes to the whole site equipment area
- Separation of site and ministry traffic
- Only possible site road is the underground garage roof with a max. load of 16t
|
| top |
| |
New Nuremberg-Ingolstadt ICE line
|
| Project period: 1998-2006 |
| Contract work: |
|
- Building machinery and equipment:
- Various tunnelling equipment:
- 12 drill carriages
- 12 mobile concrete spraying devices
- 16 tunnel wheel loaders
- 41 dump trucks
- 6 lifting platforms
- 10 tunnel diggers
- 1 electric crawler drill carriages
- 1 tunnel-driving machine ITC 112
- 3 concrete curing carriage
- 4 reinforcement carriages
- 6 safety containers
- 12 angle dozers
- 5 mobile diggers
- 5 revolving tower cranes
- 4 electric compressors
- 4 wheel loaders
- 3 water pressure booster systems
-
Various small equipment
- Electrical site equipment:
- 9 interconnecting transformer stations 20 KV
- 12 tunnel transformer stations 10 KV
- 300 site switchgear
- Delivery of various container modules (office, site restroom facility, storage, workshop, sanitary)
-
Scaffolding and shuttering:
- Special shuttering: shaft formwork, floor and vault formwork carriage
|
|
|
|
|
| top |
| |
Södertälje Bridge, Sweden
|
| Project period: 2008-2009 |
| Contract work: |
|
- Scaffolding and shuttering:
- Delivery of abutment shuttering: 1,000sqm of special shuttering
- Delivery of central pillar shuttering: 105sqm of special shuttering
- Delivery of 250sqm of rope guided climbing framework incl. pertinent platforms
- 400cu m of supporting structure
|
| Specifics: |
- When producing the special shuttering for the abutment and the central pillars, particular attention was paid to ensuring reusability of the elements produced for other structural members.
|
| top |
| |
Landmark tower and base building, Bremen
|
| Project period: 2009-2010 |
| Contract work: |
|
- Scaffolding and shuttering:
- Delivery of shuttering for walls, ceilings, columns and project-related climbing formwork for the elevator walls:
- Framax frame shuttering
- Streif round steel shuttering (support columns)
- Streif-KS column formwork (for square columns)
- Streif quick ceiling support formwork in connection with filigree support
- ID15 heavy-duty tower for the foyer in connection with a quick ceiling support system
- Skydeck with drophead system for the floor formwork
- KG240 for the elevator walls on the outside of the tower (in combination with WWP)
- 82 running meters of work and weather protection enclosure (WWP)
|
| Specifics: |
- Due to highly acute-angled corners, special parts were added to the work and weather protection elements.
- Client used the WWP for large-space advertising.
|
| top |
| |
MaxCologne, Cologne
|
| Project period: 2010-2012 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of 3 revolving tower cranes: two LH 180 EC-H10li and one LH 280 EC-H12li
- Provision of containers (site restroom facility, storeroom and access containers)
- Electrical site equipment
- Scaffolding and shuttering:
- 200 square meters of StreifLight frame formwork
- Services:
- Security and health and safety coordination
- Site power
|
| Specifics: |
- For space reasons, LH 280 EC-H12li will be set up on the existing high-rise. Due to the proximity to Cologne-Bonn airport and a helicopter landing space at the exhibition center in Deutz, the crane site required approval under air traffic laws.
|
| top |
| |
Office and administration building of GNS, Essen
|
| Project period: 2009-2011 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of three revolving tower cranes: two MDT 178 and one LH 140 EC-H li
- Delivery and assembly of a container system made up of around 20 modules
- Electrical site equipment
- Scaffolding and shuttering:
- 450 square meters of StreifLight frame formwork for the foundations
- 800 square meters of support shuttering and 1,080 square meters of steel formwork for the walls
- 4,000 square meters of quick ceiling formwork and 1,500 square meters of panel floor formwork
- Services:
- Security and health and safety coordination
- Access control
|
|
|
|
|
| top |
| |
Publishing house Süddeutscher Verlag, Munich
|
| Project period: 2006-2008 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of 5 revolving tower cranes (HH 131.6m and 120.3m with building bracing)
- Delivery and assembly of 64 office containers
- 1 access container with barrier
- Electrical site equipment incl. container supply connections, lighting
- Scaffolding and shuttering:
- Delivery of formwork for approx. 125,000sqm of area to be lined
- Some 150 running meter of fall and weather protection elements for the high-rise
- Services:
- Access control
- Setup of a central control station
- Access management with scheduled deliveries and collections
- Building floor management
- Site supervision
- Health and safety
- Supply and waste management logistics
- Daily waste disposal and primary site cleaning
- Coordination of site elevator times and cranes
|
| Specifics: |
- Inner city site
- Up to 100 subcontractors on site at a time
- Two site access poin
- Highly confined site
|
| top |
| |
Terminal 2 construction, Munich Airport
|
| Project period: 2000-2001 |
| Contract work: |
|
- Scaffolding and shuttering:
- Delivery of formwork for carcass work (560,000sqm of area to be lined)
- Technical job processing and preparation of timing and process plans
- Share in joint supplies: 60%
- Local formwork coordinators
|
|
|
|
|
| top |
| |
Tower 185, Frankfurt
|
| Project period: 2009-2011 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of seven luffing jibs: three Wolffkran 355 B, three Wolffkran 180 B, one 160 HC-L
- Delivery and assembly of 70 office and daytime accommodation containers
- Supply, maintenance and servicing of all electrical site equipment
- Provision of site utilities
- Scaffolding and shuttering:
- System shuttering for straight walls and cores
- Flex ceiling shuttering
- Flexible circular shuttering elements for curved walls
- Bearer beams and shaft platforms
- Various support shutterings and door system recesses
- Proprietary StreifLight for parapets and walls to be erected later
- Use of hydraulic self-climbing formwork for core outer walls and perforated facade
- Services:
|
| Specifics: |
- Two Wolffkran 355 B will climb to a final height of 190m and will be anchored to the building using seven bracings
|
| top |
| |
Weser Tower, Bremen
|
| Project period: 2008-2009 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of a Liebherr EC-H Litronic
- Scaffolding and shuttering:
- Delivery of shuttering for reinforced concrete works and formwork systems:
- 350sqm of steel formwork
- 500sqm of special shuttering for exposed concrete SB3
- 1,500sqm of panel floor formwork
- Square column formwork, round steel column systems, two crane displaceable climbing frame units with pertinent finishing platform
- 110 running meters of work and weather protection enclosure
|
| Specifics: |
- Crane of 98 meters was set up as free-standing unit
|
| top |
| |
|
|
| References - Shuttering |
| Barwa Commercial Avenue, Qatar |
| Beltway and Vejle bridge, Denmark |
| Elbphilharmonie (philharmonic hall), Hamburg |
| Glendoe Hydro Project, Scotland |
| Hanover Airport tunnel construction |
| Kreuzbauten, Federal Ministry of Education and Research, Bonn |
| Landmark tower and base building, Bremen |
| MaxCologne, Cologne |
| New Nuremberg-Ingolstadt ICE line |
| Office and administration building of GNS, Essen |
| Publishing house Süddeutscher Verlag, Munich |
| Södertälje Bridge, Sweden |
| Terminal 2 construction, Munich Airport |
| Tower 185, Frankfurt |
| Weser Tower, Bremen |
|