Akropolis, Athens
|
|
Project period: 2007 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery of 2 revolving tower cranes:
- 1 Liebherr 280 EC H 12 Li, height of lift 31.90m, length of jib 70m
- Kran 2 Liebherr 180 EC H 10 Li, height of lift 32.10m, length of jib 50m
|
| Specifics: |
|
The two revolving tower cranes were used to transport over 300 ancient statues and sculptures as well as a further 4000 ancient finds from the world-renowned Akropolis rock to the new Museum of History in the valley. The exhibits were packaged in steel containers and passed on by cranes lined up at the hill.
|
|
|
|
top
|
| |
Construction of new European Parliament Luxembourg
|
|
Project period: 2009-2015 |
| Contract work: |
|
- Services:
- Master planning of site equipment
- Presentation in phase plans
- Preparation of a construction logistics concept
|
| Specifics: |
- Implementation during ongoing Parliamentary business
- Only two possible access roads
- Inner city construction site
- Short shell construction period, few delivery options
|
|
|
|
top
|
| |
Elbphilharmonie (philharmonic hall), Hamburg
|
|
Project period: 2007-2010 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of 5 revolving tower cranes (HH up to 120m) incl. crane concept
- Delivery and assembly of 136 containers (office, crew accommodation)
-
Scaffolding and shuttering:
- Large delivery of different shuttering systems for foundation and bare brick work:
- Framax and Streif Light formwork, climbing formwork, Flexdeck and Skydeck floor formwork, round steel columns, column formwork, heavy-duty props, Layher stacking tower, sinking platforms, folding platforms, transfer platform
- Special shuttering
- Work and weather protection enclosure
Services:
|
| Specifics: |
- Confined site in Hamburg's harbor/warehouse district, little storage and delivery space
- Containers were integrated directly into the steel scaffolding supporting the facade of the hollowed warehouse, at seven and a half meters above the water for flood protection
- Supply of crane parts on pontoons along the river Elbe
|
|
|
|
top
|
| |
Kreuzbauten, Federal Ministry of Education and Research, Bonn
|
|
Project period:
2005-2009
|
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of site restroom facility and office containers
- Scaffolding and shuttering:
- Services:
- Supply logistics/waste management
- Instruction of parties involved in the construction process
- Transportation logistics (delivery, unloading, use of building elevator)
- Video surveillance
- Security service and key management
- Space management / cleaning and tidying
- Daily meetings
|
| Specifics: |
- Construction during ongoing ministry activities
- High security requirements
- Multiple changes to the whole site equipment area
- Separation of site and ministry traffic
- Only possible site road is the underground garage roof with a max. load of 16t
|
|
|
|
top
|
| |
NATO Airbase Ramstein
|
|
Project period: 2005-2007 |
| Contract work: |
|
- Services:
- Preparation of a master plan for the transfer to Frankfurt - Ramstein
- Central recording, coordination and handling of all transportation
- Introduction and implementation of a logistics concept
- Authorizsation concepts / space management
- Organizational project work (meetings, training/instruction and consulting)
- Planning and equipment of a central control station
- Development of standard forms
- Access logistics in close cooperation with the military escort service
|
| Specifics: |
- Stringent security requirements
- Delivery only with escort
- Complex decision-making gremiums
- Highly confined site
|
|
|
|
top
|
| |
Pier A-PLUS, Frankfurt Airport
|
|
Project period: 2008-2012 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery, assembly and catering service for several container systems (approx. 400) for parties involved in the construction
- Electrical site equipment (approx. 12km of cable; 200 connection boxes/switchgear)
- Supply of scaffolding, site elevators and hoisting devices
- Services:
- General site equipment and logistics
- Preparation of the site infrastructure (site roads, site water, telecommunications, crossings, technical infrastructure)
- Logistics coordination and management (space management)
- Site protection and site access control
- Site cleaning and waste management
|
| Specifics: |
- Stringent security requirements at the airport
- Consideration of air traffic
- Other building projects in the immediate vicinity requiring synchronization of transportation
- Crew traffic on the site
|
|
|
|
top
|
| |
PPP schools, Cologne
|
|
Project period: 2005-2007 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery, assembly and equipment of containers as temporary facilities for seven schools at five locations in Cologne (total of approx. 300 modules)
- Preparation of foundations including static calculations
- Foundation lining
- Connection to supply lines incl. water, waste water and power
- Line sheathing
|
| Specifics: |
- Tight schedule
- At times, specific hourly scheduling of assembly and equipment work
|
|
|
|
top
|
| |
PPP schools, Frankfurt am Main
|
|
Project period: 2007-2009 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery, assembly and equipment of 810 containers as temporary facilities for four Frankfurt schools
|
| Specifics: |
|
Tight schedule: majority of assemblies of the partly 3-story facilities needed to be completed within the 6-week summer vacation to ensure as little interruption of school activities as possible.
|
|
|
|
top
|
| |
PPP schools, Leverkusen
|
|
Project period: 2005-2008 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery, assembly and equipment of two containers as temporary facilities for two schools (total of approx. 140 modules)
- Preparation of foundation
- Water supply and waste water disposal incl. necessary shafts
- Rainwater discharge for both facilities
- Creation of parking spaces for teaching staff
|
| Specifics: |
- Setup of two separate EDP networks and three server cabinets
- Provision of EDP rooms with matting for conductibility
|
|
|
|
top
|
| |
Ricarda Huch high school, Gelsenkirchen
|
|
Project period: 2009-2010 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and setup of a container system comprising 84 modules used as temporary classrooms
- Equipment: Chalkboards, lightning protection, extensive fire alarm system, fire extinguishers, emergency exit lighting, electricity supply, creep zone protection
- Theft and vandalism insurance
|
| Specifics: |
- The heating in the containers is controlled via a central engineering room, from where two thirds of the entire heat output can be switched on and off in two stages
|
|
|
|
top
|
| |
Riedberg high school, Frankfurt
|
|
Project period: 2009-2012 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and assembly of 184 containers as temporary classrooms
- Preparation of foundations
- Connection to supply lines including water, sewage and power (via substation)
- Equipment: Lightning protection, building alarm, outdoor lighting, recess signal, dry lining, smoke control doors, sewage drain through container floor
|
|
|
|
|
|
top
|
| |
Stadiums for the 2012 European Football Championship, Poland
|
|
Project period: 2009-2010 |
| Contract work: |
|
- Building machinery and equipment:
- Warsaw stadium: Delivery and assembly of twelve LH180 EC-H, 256 HC, 280 EC-H and 250 EC-B type revolving tower cranes
- Posen: Delivery and assembly of four Liebherr 550 EC-H and one Potain MDT 222
- Technical consulting
|
| Specifics: |
- Posen: To create space for stadium roof assembly, four 550 EC-H were dismantled down to the foundations within a fortnight and then re-assembled to their previous height of approx. 70m
|
|
|
|
top
|
| |
United Nations Campus (UNC), Bonn
|
|
Project period: 2009-2011 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery of site power, lighting and water
- Delivery and assembly of 21 daytime accommodation and four sanitary containers
- Delivery and assembly of escape staircases and escape bridges
- Flood protection for the building right next to the Rhine
- Equipment of a first-aid facility
- Provision of chemical toilets
- Services:
- Traffic safety
- Management and control of staff and vehicle movements
- Access control and surveillance
- Transportation logistics and waste disposal management
- Demolition and dismantling for site clearance
- Delivery and setup of hoardings and gate systems
- Delivery and setup of a tire cleaning facility
- Commissioning of an existing elevator, and delivery and installation of a building elevator
- Dismantling and landscaping, setup of the site facility areas and site roads
- Cleaning services (outside, site management container and accommodations)
|
|
|
|
|
|
top
|
| |
University Hospital, 2nd construction phase, Giessen
|
|
Project period: 2009-2010 |
| Contract work: |
|
- Building machinery and equipment:
- Delivery and setup of 100 office and day accommodation containers
- Services:
- Transportation logistics
- Storage space management
- Traffic area management
- Subcontractor logistics coordination
- Site protection and surveillance incl. identification system
- Implementation of the fire protection concept
- Provision of elevator operators
- Supply and waste management logistics
- Provision of Dixi toilets
|
| Specifics: |
- At peak times, there are up to 500 people working on the site
- Coordination of an average 50 transportations/day
|
| Project report: |
|
|
|
top
|
| |
|
|
| References - Public buildings |
|
Akropolis, Athens
|
|
Construction of new European Parliament Luxembourg
|
|
Elbphilharmonie (philharmonic hall), Hamburg
|
|
Kreuzbauten, Federal Ministry of Education and Research, Bonn
|
|
NATO Airbase Ramstein
|
|
Pier A-PLUS, Frankfurt Airport
|
|
PPP schools, Cologne
|
|
PPP schools, Frankfurt am Main
|
|
PPP schools, Leverkusen
|
|
Ricarda Huch high school, Gelsenkirchen
|
|
Riedberg high school, Frankfurt
|
|
Stadiums for the 2012 European Football Championship, Poland
|
|
United Nations Campus (UNC), Bonn
|
|
University Hospital, 2nd construction phase, Giessen
|
|