Beltway and Vejle bridge, Denmark

Project period: 2005-2007
Contract work:
  • Scaffolding and shuttering:
    • Delivery of special shuttering for tunnel, bridge and troughs
  • Building machinery and equipment:
    • provision of a revolving tower crane
Specifics:
  • Individual components in exposed concrete quality
 
top
 

Glendoe Hydro Project, Scotland

Project period: 2006-2009
Contract work:
  • Building machinery and equipment:
    • Delivery and assembly of 150 accommodation containers as well as storage containers and workshops
    • Supply of transformer stations and worksite switchgear
    • Rental of various construction machinery (semitrailor tractors, telesstackers, Unimog with loading crane)
  • Scaffolding and shuttering:
    • Delivery of load towers, trestles and special shuttering
Specifics:
Due to the location on a slope and the local environmental restrictions, the whole container system was set up on wood piles
 
top
 

Gotthard Base Tunnel, Switzerland

Project period: 2001-2011
Contract work:
  • Building machinery and equipment:
    • Delivery of equipment and control systems for the curing carriage
    • Electrical site equipment:
      • 35 transformer stations as container or spherical transformer stations
      • 3 output transformers 10 MVA
      • approx. 460 pairs of medium high voltage line facilities
    • Turboventilator
    • Emergency container
Specifics:
  • Transformer stations with automatic fire extinguishing system
  • Supervision of construction site by local electrical engineers
 
top
 

Hanover Airport tunnel construction

Project period: 2008-2009
Contract work:
  • Building machinery and equipment:
    • Delivery and assembly of two 63 K type cranes
  • Scaffolding and shuttering:
    • Shuttering material for construction of the floor and outer walls of the tunnel and for the entrance and exit ramp
    • Delivery of approx. 200sqm of standard frame shuttering
    • Delivery of 350sqm of StreifTelos telescopic wall shuttering
Specifics:
  • The road tunnel to the terminal is constructed in an open excavation. Each roughly 10m long, the individual tunnel elements are split into floor panel, walls and ceiling for construction, and the components cemented separately. The appropriate shutterings are designed in a way that each section of the construction can be produced at equal pace. The shuttering elements were delivered to the site as ready assembled units.
Project report:
top
 

Highway North and Northeast Beltway, Vienna

Project period: 2007-2010
Contract work:
  • Building machinery and equipment:
    • Financing and provision of earth-moving and road construction machinery, including crawler trucks, rollers, mobile diggers, dump trucks, crawler excavators, telescopic stackers
    • Electrical site equipment
    • Small equipment
    • Revolving tower cranes
    • Container supply
    • Formwork supply
 
 
top
 

Kaiser lock JV, Bremerhaven

Project period: 2007-2010
Contract work:
  • Building machinery and equipment:
    • Delivery and assembly of containers
    • Civil engineering equipment: vibrator, lead, cable dredger, crawler crane, hammer
    • Electrical site equipment
Specifics:
  • Building conversion including heavy piling during ongoing lock and quay operation
  • Technical superiority due to variety of support sections
 
top
 

New Nuremberg-Ingolstadt ICE line

Project period: 1998-2006
Contract work:
  • Building machinery and equipment:
    • Various tunnelling equipment:
      • 12 drill carriages
      • 12 mobile concrete spraying devices
      • 16 tunnel wheel loaders
      • 41 dump trucks
      • 6 lifting platforms
      • 10 tunnel diggers
      • 1 electric crawler drill carriages
      • 1 tunnel-driving machine ITC 112
      • 3 concrete curing carriage
      • 4 reinforcement carriages
      • 6 safety containers
      • 12 angle dozers
      • 5 mobile diggers
      • 5 revolving tower cranes
      • 4 electric compressors
      • 4 wheel loaders
      • 3 water pressure booster systems
    • Various small equipment
    • Electrical site equipment:
      • 9 interconnecting transformer stations 20 KV
      • 12 tunnel transformer stations 10 KV
      • 300 site switchgear
    • Delivery of various container modules (office, site restroom facility, storage, workshop, sanitary)
  • Scaffolding and shuttering:
    • Special shuttering: shaft formwork, floor and vault formwork carriage
 
 
top
 

Predöhl quay JV, Hamburg

Project period: 2008-2009
Contract work:
  • Building machinery and equipment:
    • Delivery and assembly of containers
    • Civil engineering equipment: pontoon, work boat, crawler crane, vibrator
Specifics:
  • Work during ongoing (container) handling
  • Preceding soil replacement for pile driving track
 
top
 

Södertälje Bridge, Sweden

Project period: 2008-2009
Contract work:
  • Scaffolding and shuttering:
    • Delivery of abutment shuttering: 1,000sqm of special shuttering
    • Delivery of central pillar shuttering: 105sqm of special shuttering
    • Delivery of 250sqm of rope guided climbing framework incl. pertinent platforms
    • 400cu m of supporting structure
Specifics:
  • When producing the special shuttering for the abutment and the central pillars, particular attention was paid to ensuring reusability of the elements produced for other structural members.
 
top
 
References - Civil engeneering
Beltway and Vejle bridge, Denmark
Glendoe Hydro Project, Scotland
Gotthard Base Tunnel, Switzerland
Hanover Airport tunnel construction
Highway North and Northeast Beltway, Vienna
Kaiser lock JV, Bremerhaven
New Nuremberg-Ingolstadt ICE line
Predöhl quay JV, Hamburg
Södertälje Bridge, Sweden